After finishing the insulation in our waterfront cabin, we were ready to continue working on our tiny cabin interior. This was a pretty exciting stage of the build because we could finally start to see what the finished cabin was going to look like. It was also fairly chaotic because there was so much to do in a small space, as you will see from the progress pictures. In this post, I’ll walk you through how we finished the interior of our tiny cabin, including installing the pine wall panelling, flooring, bathroom, kitchen, and some of the other finishing details.
Installing the Flooring
When we took apart the original cabin, we weren’t able to save any of the flooring. In the previous cabin, we had used vinyl click flooring, and we loved it so much that we decided to use a very similar product again. This time, we chose a dark grey 12-by-24-inch vinyl click tile with an interesting motif pattern built into it. I really enjoy installing flooring, especially vinyl click flooring. It goes down fairly quickly and easily, and it’s one of those projects that instantly makes a space feel more finished.




Installing the Pine Wall and Ceiling Panelling
For the walls and ceilings, we used tongue-and-groove pine panelling. We were able to salvage most of the panelling from the original cabin, although we did have to purchase a little extra to finish everything. In our previous cabin, we had whitewashed the ceiling, but this time we decided to leave all the walls and ceilings natural. We installed the panelling horizontally using a nail gun, including throughout the loft. This was a pretty big job, but it made such a difference once the walls and ceilings were covered. And one of my favourite things about using pine was how good it made the cabin smell.



Finishing the Bathroom
For the bathroom, we were able to reuse all the fixtures from our previous cabin, including the cast iron clawfoot bathtub that I refinished. Since we were already happy with the bathroom in the original cabin, we didn’t make many changes when we rebuilt it. We reinstalled the fixtures and added an electric baseboard heater to make the bathroom a little more comfortable during the colder months.


Installing the Kitchen
We were also able to reuse the entire kitchen from our original cabin, so most of the work involved reinstalling everything in its new location. Tony had originally built all the kitchen cabinet boxes himself, and we had ordered custom cabinet doors in a beautiful sage green colour. We were really happy that we could reuse everything rather than having to build an entirely new kitchen.




The biggest difference in the new kitchen was the removal of the back wall and the addition of the staircase. This gave us a little extra space to add some custom shelving for a large air fryer. Since this is such a small kitchen, we don’t have room for a full-sized oven, so having a dedicated spot for the air fryer was a big improvement. I used some leftover pine to build the shelf and then had paint custom colour-matched to the kitchen cabinets. This helped the new shelving blend in with the rest of the kitchen.


Finishing the Staircase and Loft Railings
As I mentioned in my previous post about building our tiny cabin stairs, we built the staircase and loft railings using solid pine and black metal spindles. For the loft railing, we used pine 2x4s to frame the opening and installed black spindles, spaced according to the requirements for our build. This was a change from our original cabin, where we had used horizontal metal wires for a more industrial look. We really like how the black spindles look against the natural pine, and they tie in nicely with the staircase.

Interior Trim and Finishing Touches
One of the last steps in finishing the interior was installing the trim. We used rough-cut pine and painted it white to add a little contrast against all the natural wood. We also installed the bathroom door, which we painted using a custom colour match to our kitchen cabinets. For lighting, we kept things pretty simple with recessed pot lights in the ceiling. We also installed electric baseboard heaters to heat the cabin. And of course we added a tv to the living room.



Empty Sea Container!
One of the biggest milestones during this stage of the build was finally emptying the sea container! If you’ve been following this series from the beginning, you’ll remember that we rented a sea container to store all the materials we salvaged when we took apart the original cabin. As we rebuilt the cabin, we gradually emptied the container and reused the materials we had stored inside. By the time we finished most of the interior work, the sea container was completely empty, and we were finally able to have it removed from the property.

The Finished Tiny Cabin Interior
With the flooring, panelling, kitchen, bathroom, and finishing details complete, the inside of our tiny cabin was finally coming together. There were still a few things left to do, but we were getting pretty close to having a finished cabin. In the next post, I’ll share how we finished the exterior, including the deck, landscaping, and outdoor living areas. After that, I’ll finally share a complete tour of our finished waterfront cabin.





Leave a Reply