Week 12: Basement Concrete With Heated Floor

Last week the guys finished pouring the concrete slab in the basement. Before that was done though there was quite a bit of prep work, which included dumping more gravel into the basement, and leveling it off. Amvic Insulated Panel Then we laid down Styrofoam insulation on top of the gravel. We used the Amvic insulated panel…

Weeks 10 & 11: Interior Framing and Plumbing

The last two weeks have been a mix of a lot of different things, mostly including interior framing as well as the plumbing rough in. Our main contractors, Dovetail Carpentry, did all the interior framing over the last two weeks. We hired a plumber from Chesterville, ON to do all the plumbing rough-ins, and he will…